北安妮女王的CPP

北安妮女王学校的Cascade家长合作

Upgrade existing school building to better meet the needs of 层叠父母合伙.

喀斯喀特家长合伙公司回到了他们的家乡.

construction phase graphic showing that the school is in the Open phase
了解每个项目阶段

剪彩仪式

On Sept. 11, 层叠父母合伙 returned to North Queen Anne School after seismic upgrades and other improvements to better meet the needs of the school community.

仪式的照片如下.

a man stands next to some helium balloons and a red ribbon stretched between silver stands
冈德校长在典礼前与家属交谈
a man hands something to a child while and adult and another child stand by
项目经理Mark Emelko与学生们分享彩带
一群人拿着红丝带. one person has huge scissors and has his hand in the air in celebration
冈德校长庆祝开学
一群人在一条红丝带后面排成一排. 所有人都拿着剪刀,中间的人拿着大剪刀
倒数开学倒计时
一群人拿着剪刀剪下了一条红丝带
彩带剪好了!

最近的进展

Read a story about the chalkboard uncovered during demolition with signatures from 1938

9月,项目组:

  • 在开学前完成了大部分工作
  • 9月11日与家属及员工举行剪彩仪式. 11, 2023
  • 继续进行楼宇调试工作.
  • 开始打拳工作.

项目进度图

平面图
显示现有建筑物的地盘图则
走廊上有扇门
前室内走廊从主入口向东
有门的走廊. the floor is covered with protective material and the ceiling has been removed so you can see wires and beams
Interior corridor facing east from main entrance – demolition in progress – Feb. 2022
一条走廊,墙上和门上都有公告牌
以前:东走廊朝北
一条有天窗的走廊,墙壁被剥得只剩钉钉
东走廊朝北,正在拆除中- 2月. 2022
一个大的铸铁锅炉,里面有管道
施工前:锅炉房
一个正在拆除的大房间
锅炉房正在拆除- 2月. 2022
一块钢板上写着西雅图学区. No. 1 1913
1913年从原锅炉上拆下的钢板. 现在是SPS档案的一部分.
一块黑板上用粉笔写满了名字
拆除时发现的黑板, 1938年1月由学校的学生和工作人员签署-很不幸, it is a material painted onto wall board and cannot be removed and preserved – Feb. 2022
截止日期1月31日. 31, 1938
近距离观察黑板上1938年签名的部分. 2022
workers stand in front of a brick building that has holes for windows and a door, 但它们是用胶合板填充的
Exterior view of new door to outside on the east wall of the classroom area – Mar. 2022
混凝土墙上有一个用胶合板代替玻璃的窗户空间
准备办公室的新窗户,靠近主入口- 3月. 2022
在一个大房间里,有通往其他空间的大开口
在下议院内向北看——三月. 2022
a large open space has windows that are closed off with wood and a pile of soile next to a trench
North side of main entry corridor looking north toward the new office – Mar. 2022
一扇敞开的双门道四周有几扇木框窗
Looking into the main entry corridor from the main entrance, looking east into the building – Mar. 2022
在铁链栅栏和用木板封起来的砖房之间的车道
进入校园- 2022年4月
在有独轮车的在建建筑里
The plywood is covering the space for the new window in the new office – April 2022
工人们站在正在施工的建筑物的一个大空地上
Looking east from the new office space toward what will be the library – April 2022
一间有混凝土地板和梯子的混凝土房间
前锅炉房的拆除工作即将完成——2022年4月
一个砖砌烟囱,大约有三分之二的砖被拆除了
烟囱的拆除工作即将完成——2022年4月
有裂缝的混凝土天花板
意外裂缝需要修复,2022年5月
a room under construction with a blackboard below bricks, there is an x on one wall
建议清洗地点标X,时间为2022年5月
钢梁:正在建造的房间里的钢梁
结构钢已经交付,并将于2022年5月搬迁
用塑料框架和覆盖的方形屋顶
烟囱拆除完成,2022年5月
砖房前的混凝土区域,窗户用木板封住
游戏区改善工作已经开始- 2022年6月
一个人站在一个用金属柱子建造的房间里
Temporary supports being used during structural steel installation – June 2022
砖黑墙,前面有钢筋
在历史悠久的黑板前安装钢筋- 2022年6月
用木结构代替现有建筑
内墙施工进行中- 2022年6月
一堵前面有脚手架的混凝土墙
Concrete installed over the historic chalkboard; smooth area to be removed to show chalk signatures – Aug. 2022
一间正在建造的大房间,用胶合板盖住窗户开口
主办公室钢结构安装- 8月. 2022
砖墙的近景,旁边有一扇胶合板窗
在安装窗户之前砖砌体已修复- 8月. 2022
有窗户的混凝土墙
主办公室新窗周围喷射混凝土墙- 8月. 2022
混凝土墙:在建建筑物中的混凝土墙
混凝土安装在历史悠久的黑板上, 在1938年至2009年9月的签名中,有一个区域被标记为镂空. 2022
平屋顶上的开口舱口
安装了新的屋顶舱口- 9月. 2022
固定装置平屋顶上的机械装置
机械系统的新屋顶单元- 9月. 2022
钢柱和钢梁正在建造的室内空间
在图书馆空间增加额外的钢支撑- 10月. 2022
a ceiling with no tiles and a steel i-beam perpendicular to two existing beams
Installing structural steel and steel tie rods in main office space – Oct. 2022
an interior of a building under construction with wood framing and a structural steel beam
行政办公室的内部框架正在进行中- 11月. 2022
木框架内墙,立柱之间有隔热层
安装绝缘- 11月. 2022
旧建筑的木框架加上新的金属梁
Installing wood framing at the main office and administrative area – Dec. 2022
混凝土墙之间的木框架连接着管道
安装水管-十二月. 2022
金属管道系统在天花板旁边的大管道
在天花板上安装管道、管道系统和洒水装置- 12月. 2022
墙角有平屋顶的砖砌建筑的墙角. 一辆卡车停在前面
窗口安装完成- 1月. 2023
a yellow painted brick building with a rust colored cornice has windows
南墙上的新窗户. 2023
有窗户的L形砖建筑
西北角窗户完整- 1月. 2023
a room with construction going on - the walls do not have wall board and a frame for a counter is in front
Reception counter and window frame underway in new administrative office – Jan. 2023
a wood framed wall and ceiling has pink insulation behind clear plastic
绝缘装置继续安装- 1月. 2023
一间未完工的房间的窗户安装在木框墙上
窗户安装在西墙-一月. 2023
木质框架向房间开放,房间背面有墙板. 在墙壁上可以看到管道、管道和电线导管
Rough in of mechanical, electrical, plumbing, and sprinklers in the kitchen – Feb. 2023
a large room under construction with wallboard installed on one side, windows on the other. 水泥地板
View of the library looking west toward the checkout desk location – Feb. 2023
混凝土垫块上安装有游戏结构的一部分. 背景是树
游戏结构正在安装- 2月. 2023
一间正在建造的房间在墙钉之间铺上了粉红色的蓬松材料, 一扇通向外面的窗户, 还有一个半成品的大盒子
Administration office location with reception counter under construction – March 2023
一间在建的房间铺着混凝土地板, 带窗户的深窗井, 墙壁上的石膏墙板
图书馆墙板安装正在进行中- 2023年3月
a room underconstruction has four glass panels with black framing between two walls. 玻璃上写着“娜娜墙”."
NanaWall – folding wall panels – installed between main hallway and the lunchroom – March 2023
outside of a 1-story brick building, playground equipment is being installed. 背景中有树
游乐场安装工程正在进行- 2023年3月
an unfinished gypsum covered wall has a four-panel glass door installed
Folding glass wall between the main corridor and the commons – April 2023
一个用胶布粘住但未完工的墙板、半面墙和一扇窗户的房间
Future reception counter and exterior window in administration area – April 2023
人造草皮上的户外游戏场地
新的游乐区设备- 2023年4月
一种粗糙的混凝土地板,墙壁上有钉钉
2023年5月拆除地下楼板,为新的混凝土浇头做准备
光滑的混凝土地板,墙壁上有钉钉和窗户
2023年5月,教室浇筑混凝土浇头
a room with piping at the ceiling, windows on the right side wall, and a door on the left side. 地面为混凝土,后墙为混凝土砌体单元
美术室的更新工作正在进行中- 2023年5月
a hallway has wallboard installed and taped, an open ceiling with a skylight, and covered floors. 两个梯子在右下角,电源线沿着地板.
Intersection from west wing to east wing with taping and plastering in progress – June 2023
一个房间有木天花板. 墙壁是墙板,用胶带和泥浆安装. 右边有一扇窗户,左边有门
2023年6月,其中一间教室完成了墙板、胶带和泥浆
an unfinished hallway with one wall showing wallboard that is taped and mudded. 吊顶为开放式,部分安装了金属格栅
安装西翼天花板网格- 2023年6月
有窗状开口的墙的一部分
Location of the preserved section of the historic chalkboard, still under protection – June 2023
a window is inset into a wall and has a black surface with chalk writing behind the plexiglass
Preserved section of the historic chalkboard in the library – August 2023
走廊上有通往外面的门. 墙壁底部是白色的,顶部是灰色的
1922年东翼的走廊- 2023年8月
一间门通向外面,窗户在一面墙上的教室
东翼教室- 2023年8月
一个大的空房间的一侧有大的折叠玻璃门
Updated commons complete with new folding wall to hallway – August 2023

项目简介

The North Queen Anne School building is undergoing upgrades to better meet the needs of 层叠父母合伙.

工作包括地震安全的地震升级, expansion of the fire sprinklers and fire alarm system to connect the whole building, 采暖通风系统更换, 电气系统升级. 室内地板、天花板和橱柜将被更换.

现有的项目空间将被重新配置和升级. Exterior doors will be added to the arts classroom and science classroom to provide access to outdoor areas for classroom projects. This the school administration area will be moved next to the main entrance. 一个新的窗户将提供入口和停车场的能见度. The commons/lunchroom space will have moveable glass walls that can open to the corridor — providing both natural light and the ability to enlarge the space for school gatherings.

项目设计: Meng Strazzara工作室

Contractor:擎天柱建筑

项目预算: $8.14 million

资金来源: 由卓越建筑基金(bexv)资本征款资助, 由西雅图选民于2019年批准, 和建筑物, Technology, 及学术/体育IV (btaiv)基本征费, 2016年由选民通过.

项目经理Mark Emelko, mmemelko@xafmjx.net, 206-252-0670