北安妮女王的CPP
北安妮女王学校的Cascade家长合作
Upgrade existing school building to better meet the needs of 层叠父母合伙.
喀斯喀特家长合伙公司回到了他们的家乡.
![construction phase graphic showing that the school is in the Open phase](http://bookshop.xafmjx.net/wp-content/uploads/2022/08/ConstructionProgress_7_Open-1024x122.png)
剪彩仪式
On Sept. 11, 层叠父母合伙 returned to North Queen Anne School after seismic upgrades and other improvements to better meet the needs of the school community.
仪式的照片如下.
最近的进展
Read a story about the chalkboard uncovered during demolition with signatures from 1938
9月,项目组:
- 在开学前完成了大部分工作
- 9月11日与家属及员工举行剪彩仪式. 11, 2023
- 继续进行楼宇调试工作.
- 开始打拳工作.
项目进度图
项目简介
The North Queen Anne School building is undergoing upgrades to better meet the needs of 层叠父母合伙.
工作包括地震安全的地震升级, expansion of the fire sprinklers and fire alarm system to connect the whole building, 采暖通风系统更换, 电气系统升级. 室内地板、天花板和橱柜将被更换.
现有的项目空间将被重新配置和升级. Exterior doors will be added to the arts classroom and science classroom to provide access to outdoor areas for classroom projects. This the school administration area will be moved next to the main entrance. 一个新的窗户将提供入口和停车场的能见度. The commons/lunchroom space will have moveable glass walls that can open to the corridor — providing both natural light and the ability to enlarge the space for school gatherings.
项目设计: Meng Strazzara工作室
Contractor:擎天柱建筑
项目预算: $8.14 million
资金来源: 由卓越建筑基金(bexv)资本征款资助, 由西雅图选民于2019年批准, 和建筑物, Technology, 及学术/体育IV (btaiv)基本征费, 2016年由选民通过.
项目经理Mark Emelko, mmemelko@xafmjx.net, 206-252-0670